Steps 25 - 28 |
Episodic Reporting Requirements | |||||||
The following steps describe the on-going requirements. The facility personnel are responsible for assuring that this section of Module 4 is performed whenever necessary so that all on-going requirements are met whenever they are relevant. |
|||||||
Yes |
|||||||
No |
|||||||
Module 4, Steps 31 and 32 |
DOE Office of Environmental Policy and Guidance |